top of page

Our Work

You’re invited to browse a selection of recently completed projects below.

Dual pedestal charge points

Network 46 Project

A multi-phase development at St Modwen Park situated off the A46 between Lincoln and Newark. These large industrial facilities provide businesses with excellent access to sea ports, airports and the national motorway network.

Working as the electrical contractor on these projects our team of EV chargepoint installers were instructed to install a series of Quantum:EV units to provide the necessary electric vehicle charge solution for visitors and employees.

Our installers worked alongside the main contractor Lindum Construction throughout the new build phase to ensure the chargepoints were installed and fully operational prior to the handover date. We managed the commissioning of these chargepoints to ensure they were fully operational and we also provided training to the client on how to use and manage these chargepoints on a day-to-day basis.

Active8 Managed Technologies

Working with a company based in Newark that offer quality end-user business services, offering Managed Print Services, IT Services and Hosted Telephony. This business required two chargepoints to provide workplace charging for the directors of the business, as well as for office staff who decide to purchase a PHEV or BEV.

We supplied and installed two Pod Point Solo 3, 22kW commercial chargers that were wall-mounted onto the building, ensuring we offered the customer a cheaper way of providing EV chargepoints, negating the need for costly groundworks and charging pedestals to be installed. 

Two 22kW Pod Point wall mounted units
EV Charger set up with two dual units and a single wall mounted unit

SCS Technology Solutions

We worked with a Lincoln based IT support company who were looking to provide an EV charging infrastructure for their employees that drive company vehicles. The business has recently made a decision to electrify their fleet and required five chargepoints.

We installed two twin Rolec 7kW Quantum:EV units to ensure four employees could charge at once. We then installed a 7kW Role Wallpod:EV to offer visitors the opportunity to charge their BEV of PHEV.

With limited parking available we were able to provide the business with five EV parking spaces, whilst leaving enough space for others to park on site. By being an OZEV approved installer our client was able to claim the Workplace Charging Scheme grant, which saved them £1750 on installation costs.

Contact us today for your free estimate

bottom of page